{"id":3233,"date":"2026-07-21T09:59:58","date_gmt":"2026-07-21T01:59:58","guid":{"rendered":"https:\/\/panocourt.com\/padel-court-construction-requirements-planning-guide\/"},"modified":"2026-07-21T10:15:53","modified_gmt":"2026-07-21T02:15:53","slug":"panduan-perencanaan-persyaratan-pembangunan-lapangan-padel","status":"publish","type":"post","link":"https:\/\/panocourt.com\/id\/padel-court-construction-requirements-planning-guide\/","title":{"rendered":"Pembangunan Lapangan Padel pada Tahun 2026: Panduan Lengkap Persyaratan dan Perencanaan"},"content":{"rendered":"<p>Padel court construction looks simple from the outside \u2014 a 20 x 10 m court, glass walls, artificial grass. In practice, most project failures we see as a padel court manufacturer have nothing to do with the court itself. They come from foundations designed without wind calculations, warehouses leased without checking clear height, and indoor halls with no humidity plan. This guide consolidates the 2026 requirements for padel court construction \u2014 indoor and outdoor \u2014 based on the LTA construction guidance, the SAPCA Code of Practice (5th Edition, September 2025) and our own export project experience across Europe, the Middle East, Africa and Southeast Asia.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img fetchpriority=\"high\" decoding=\"async\" width=\"452\" height=\"561\" src=\"https:\/\/panocourt.com\/wp-content\/uploads\/2026\/07\/\u5fae\u4fe1\u56fe\u7247_20260707125318_413_388.png\" alt=\"pembangunan lapangan padel\" class=\"wp-image-3137\" style=\"object-fit:cover;width:766px;height:600px\" srcset=\"https:\/\/panocourt.com\/wp-content\/uploads\/2026\/07\/\u5fae\u4fe1\u56fe\u7247_20260707125318_413_388.png 452w, https:\/\/panocourt.com\/wp-content\/uploads\/2026\/07\/\u5fae\u4fe1\u56fe\u7247_20260707125318_413_388-242x300.png 242w, https:\/\/panocourt.com\/wp-content\/uploads\/2026\/07\/\u5fae\u4fe1\u56fe\u7247_20260707125318_413_388-10x12.png 10w\" sizes=\"(max-width: 452px) 100vw, 452px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">What Are the Core Requirements for Padel Court Construction?<\/h2>\n\n\n\n<p>Every padel court, indoor or outdoor, must meet the same geometric baseline: a 20.0 m x 10.0 m playing area, 4.0 m rebound walls (3.0 m glass or solid material plus 1.0 m of 50 x 50 mm weldmesh), a minimum 6.0 m clear height above the surface, and a sand-dressed artificial grass surface tested to UNE 147301.<\/p>\n\n\n\n<p>Key specifications that apply to every project:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Dimensions:<\/strong> 20 m x 10 m internal playing area; 50 mm white lines; net 10 m long, 0.88 m at centre and 0.92 m at the posts.<\/li>\n\n\n\n<li><strong>Glass:<\/strong> 12 mm toughened glass for outdoor and canopy-covered courts (mandatory); 10 mm may be considered for fully indoor courts. Every panel certified, with countersunk fixings and a uniform 3\u20136 mm panel gap.<\/li>\n\n\n\n<li><strong>Clear height:<\/strong> 6.0 m absolute minimum including light fittings; 8.0 m over the net line for elite competition.<\/li>\n\n\n\n<li><strong>Steel:<\/strong> minimum 3 mm profile thickness, hot-dip galvanised to EN ISO 1461 after fabrication, with powder coating (PanoCourt standard: 80\u2013100 \u00b5m) and stainless-steel fixings.<\/li>\n\n\n\n<li><strong>Accessibility:<\/strong> 1.2 m clear access between net post and enclosure for sports wheelchairs.<\/li>\n\n\n\n<li><strong>Surface performance:<\/strong> shock absorption 15\u201325%, ball rebound \u226580%, rotational resistance 25\u201350 Nm, permeability \u2265500 mm\/hr (outdoor).<\/li>\n<\/ul>\n\n\n\n<p>These numbers are not negotiable design preferences \u2014 they come from the FIP-adopted Spanish standards and the UK SAPCA code, and serious buyers and padel court builders now specify them in every tender.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How many people are needed for padel court constrution? <\/h2>\n\n\n\n<p>It usually requires 3-4 people, and it takes about 5-7 days to install one set, and the fastest one can be installed in 4 days. It is recommended to consult an experienced padel court installation team. The process is usually that the factory provides padel court qualifications, which are signed and confirmed by a local architect, and then submitted to the local government for approval and a building permit is obtained. Requirements and standards vary from region to region, so it is recommended to consult a local architectural designer.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Foundation Does a Padel Court Need?<\/h2>\n\n\n\n<p>An outdoor padel court needs an engineered reinforced-concrete foundation \u2014 most commonly a perimeter ring beam around 400 mm wide, or a full slab of 15\u201325 cm with an integral ring beam \u2014 designed by a licensed local structural engineer for the site&#8217;s actual wind load and ground conditions. A single court carries roughly 3\u20134 tonnes of steel and glass and can see lateral wind forces in the order of 24 kN.<\/p>\n\n\n\n<p>The standard outdoor build-up, bottom to top:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Formation: topsoil stripped (\u226575 mm), compacted and levelled to +25\/\u221250 mm tolerance.<\/li>\n\n\n\n<li>Geotextile membrane for separation, strength and crack isolation.<\/li>\n\n\n\n<li>Free-draining, non-frost-susceptible aggregate sub-base, average 250 mm depth.<\/li>\n\n\n\n<li>Porous asphalt in two courses: 40 mm binder + 25 mm surface (\u224865 mm total).<\/li>\n\n\n\n<li>Padel-specific artificial grass, dressed with dry silica sand.<\/li>\n<\/ul>\n\n\n\n<p><strong>Real-world insight:<\/strong> the ring beam must finish level with the internal asphalt so glass panels sit flush without stepping \u2014 an out-of-level base telegraphs directly into glass alignment and door fit. And if a canopy is planned later, size the foundation now for the larger canopy base plates; retrofitting foundations that clash with the court ring beam is one of the most expensive mistakes in padel court construction.<\/p>\n\n\n\n<p>Steel-plate and weighted-platform enclosures exist, but no reputable engineer will sign them off for a permanent outdoor court without combined calculations covering the enclosure plus the substrate beneath it. For coastal sites, corrosion \u2014 not wind \u2014 often governs the specification; see our dedicated <a href=\"https:\/\/panocourt.com\/seaside-padel-court\/\">seaside padel court build guide<\/a> for Duplex-coated and aluminium options.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Are the Requirements for Indoor Padel Court Construction?<\/h2>\n\n\n\n<p>Indoor padel court construction is governed by four things: building geometry, slab condition, climate control and fire compliance. The screening test for any building \u2014 especially warehouse conversions \u2014 is a clear height of at least 6.0 m over the whole playing area (7 m+ recommended), a column grid that fits full 20 x 10 m courts plus run-off, and a structural slab you are permitted to anchor into.<\/p>\n\n\n\n<p><strong>Slab and anchoring.<\/strong> New indoor courts typically sit on an 18\u201320 cm reinforced slab with a levelled screed. For existing slabs, verify thickness, flatness, cracks and moisture before signing the lease \u2014 commission core drilling if the build-up is unknown. Enclosures anchor about 100 mm into sound concrete with expansion or chemical anchors, and expansion joints must be filled with high-modulus PU filler so ball bounce stays true.<\/p>\n\n\n\n<p><strong>HVAC and indoor climate.<\/strong> This is where indoor padel court construction is most often under-designed. Reference targets used across the industry:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Parameter<\/th><th>Target<\/th><th>Why it matters<\/th><\/tr><\/thead><tbody><tr><td>Air temperature<\/td><td>16\u201320 \u00b0C typical; 18\u201322 \u00b0C heating design in cold climates<\/td><td>Stable play conditions and member comfort<\/td><\/tr><tr><td>Relative humidity<\/td><td>40\u201360% RH<\/td><td>Prevents condensation on glass and slippery turf<\/td><\/tr><tr><td>Ventilation<\/td><td>\u22484\u201312 air changes per hour by occupancy<\/td><td>Air quality at peak occupancy, moisture removal<\/td><\/tr><tr><td>Air movement<\/td><td>No draughts across courts; high-level extract, low-level supply<\/td><td>Draughts visibly alter ball flight<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Deep insight:<\/strong> new airtight halls need a full climate-control solution \u2014 heating, cooling, ventilation and dehumidification together \u2014 not a heating-only system. In humid and coastal markets, a dedicated dehumidification plan is the difference between a premium club and fogged glass every morning. Zone the courts, changing rooms and caf\u00e9 separately; they run on completely different loads and schedules.<\/p>\n\n\n\n<p><strong>Fire and statutory compliance.<\/strong> Converting a warehouse to a sports venue is a change of use in almost every jurisdiction: expect fresh requirements for exits, occupancy loads, emergency lighting, accessible toilets and parking. Budget for this before the lease, not after.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How Do You Plan Drainage, Lighting and Utilities?<\/h2>\n\n\n\n<p>Outdoor drainage relies on percolation through the porous construction to perimeter perforated drains laid at 1:200 falls, discharging through the ring beam to an outfall or soakaway. The court itself may be laid level or to a maximum 1:100 gradient at formation level. Catchwater drains are mandatory wherever surrounding ground can shed water onto the court.<\/p>\n\n\n\n<p>Lighting minimums are identical indoors and outdoors: 300 lux average with 0.5 uniformity for recreational and club use, and 500 lux with 0.7 uniformity for national and international competition, designed on a 1 m x 1 m grid with a 0.9 maintenance factor. Fittings must preserve the 6 m clear space and sit 4 m from the back walls for a side-lit arrangement. Power draw is typically 1.2\u20132.4 kW per court; multi-court venues usually need a three-phase supply. Run lighting cables in ducts at least 450 mm deep so future resurfacing never cuts them.<\/p>\n\n\n\n<p><strong>Key facts:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Use asymmetric, sport-specific LED optics \u2014 cheap symmetrical floodlights fail glare and spill assessments.<\/li>\n\n\n\n<li>Near housing, planners increasingly demand both lux and candela calculations plus fitting tilt angles.<\/li>\n\n\n\n<li>LED running cost benchmark: roughly \u00a31 per court per hour.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">How Much Does Padel Court Construction Cost in 2026?<\/h2>\n\n\n\n<p>Total padel court construction cost splits into two roughly equal halves: the court system (structure, glass, turf, lighting) and the civil works (foundation, base, ducting, drainage). Published 2026 UK delivered-project data puts one court with lights at about \u00a336,000 plus \u00a335,000 of ring beam and groundworks \u2014 around \u00a371,000 all-in \u2014 falling per court as quantities rise (four courts \u2248 \u00a3268,000 total). A canopy adds roughly \u00a395,000 for a single court including its foundations.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Cost element<\/th><th>What drives it<\/th><\/tr><\/thead><tbody><tr><td>Court system (factory)<\/td><td>Steel grade and coating system, 10 vs 12 mm glass, turf spec, lighting package \u2014 this is where a china padel court factory typically saves buyers 30\u201350% versus European brands at equal specification<\/td><\/tr><tr><td>Foundation &amp; base<\/td><td>Ground conditions, wind zone, ring beam vs slab, local labour rates<\/td><\/tr><tr><td>Shipping &amp; duties<\/td><td>Container count, destination port, Incoterms<\/td><\/tr><tr><td>Pemasangan<\/td><td>Local crew rates, site access, indoor vs outdoor<\/td><\/tr><tr><td>Indoor extras<\/td><td>HVAC, dehumidification, fire compliance, fit-out<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>For a line-by-line breakdown with real freight rates and an interactive tool, use our <a href=\"https:\/\/panocourt.com\/padel-court-cost-calculator\/\">kalkulator biaya lapangan padel<\/a>, and see the <a href=\"https:\/\/panocourt.com\/padel-court-cost-real-quotation-comparison-2026\/\">real quotation comparison<\/a> that shows why the cheapest padel court price usually costs more over five years.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How Do You Choose a Padel Court Manufacturer or Builder?<\/h2>\n\n\n\n<p>Choose a padel court manufacturer on verifiable specification, not brochure claims: steel grade certificates, galvanising standard (EN ISO 1461), coating thickness reports, glass certification, salt-spray test results and a written structural warranty of at least 10 years. Then choose local padel court builders for the civil works who will price against a proper engineer-designed tender package.<\/p>\n\n\n\n<p><strong>Key facts for vetting any padel court supplier:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Ask for the maximum design windspeed of the enclosure \u2014 a real factory states it; a trader cannot.<\/li>\n\n\n\n<li>Manufacturer warranties often cover component wear only, not structural failure of the perimeter: get structural cover in writing.<\/li>\n\n\n\n<li>Obtain at least three comparable quotations against one identical specification, and visit or video-audit a reference installation.<\/li>\n\n\n\n<li>Confirm export documentation: CE files, packing lists, installation drawings and remote installation support.<\/li>\n<\/ul>\n\n\n\n<p><strong>Real-world insight:<\/strong> the biggest quality gaps we see are invisible in photos \u2014 galvanising applied before welding instead of after, 60 \u00b5m coating sold as 100 \u00b5m, and second-hand enclosures re-erected without any structural calculations. Our <a href=\"https:\/\/panocourt.com\/china-padel-court-factory-buyers-guide-2026\/\">China padel court factory buyer&#8217;s guide<\/a> covers the full vetting checklist, and the <a href=\"https:\/\/panocourt.com\/padel-court-installation\/\">padel court installation guide<\/a> explains standards, tools and installer selection.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Planning Permits and Compliance Rules Apply?<\/h2>\n\n\n\n<p>Almost every padel court construction project needs formal planning or zoning consent for the 3\u20134 m walls and 6 m lighting, and fully enclosed structures are treated as buildings under local building regulations. Two issues dominate applications in 2026: noise and light.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Noise:<\/strong> if residential property sits within about 30\u201350 m, commission a professional acoustic assessment before applying. Courts have been shut down post-construction on environmental-health noise grounds \u2014 orientation, acoustic barriers and operating hours are cheaper than closure.<\/li>\n\n\n\n<li><strong>Light:<\/strong> supply a full lighting data pack (lux, candela, tilt angles, spill contours) aligned with obtrusive-light guidance.<\/li>\n\n\n\n<li><strong>Environment:<\/strong> greenfield projects in England must deliver 10% Biodiversity Net Gain; other markets apply their own drainage-uplift and environmental rules.<\/li>\n\n\n\n<li><strong>Engineering sign-off:<\/strong> foundations, canopies and structures must be calculated and stamped by a locally licensed structural engineer carrying professional indemnity insurance \u2014 this is explicit in the SAPCA code and non-negotiable in any serious market. Demand for compliant courts is only rising: see what the <a href=\"https:\/\/panocourt.com\/padel-court-construction-london-padel-boom\/\">\u00a35.5M London padel boom<\/a> signals for builders and investors.<\/li>\n<\/ul>\n\n\n\n<p>Authoritative references: the <a href=\"https:\/\/www.lta.org.uk\/roles-venues\/venues\/facilities-loans-advice\/\" rel=\"dofollow noopener\" target=\"_blank\">LTA facilities guidance<\/a> dan <a href=\"https:\/\/sapca.org.uk\/\" rel=\"dofollow noopener\" target=\"_blank\">Sports and Play Construction Association (SAPCA)<\/a>, publisher of the Code of Practice for the Construction of Padel Courts.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">FAQ: Padel Court Construction<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Berapa lama waktu yang dibutuhkan untuk membangun lapangan padel?<\/h3>\n\n\n\n<p>Typically 6\u201312 weeks on site for outdoor courts: 2\u20134 weeks for groundworks and curing, 1\u20132 weeks for structure and glass erection per block of courts, plus surfacing and commissioning. Add manufacturing lead time (4\u20138 weeks) and sea freight (3\u20136 weeks) when sourcing factory-direct. Indoor conversions depend mostly on building works and HVAC installation.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What size slab do I need for a padel court?<\/h3>\n\n\n\n<p>Plan a minimum 21 m x 11 m foundation footprint for a 20 m x 10 m court. Full slabs run 15\u201325 cm thick depending on ground conditions and loads; indoor slabs are typically 18\u201320 cm reinforced concrete with a levelled screed. The final section is always a structural engineer&#8217;s calculation, never a catalogue value.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Can I build a padel court on an existing tennis court?<\/h3>\n\n\n\n<p>Often yes. The existing sub-base must be assessed by a competent designer, the asphalt pierced at 450 mm centres for drainage, and a new engineer-designed enclosure foundation set into the surface. A detailed gradient survey is required first, because glass panels need a level perimeter.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">How much space do you need for one padel court?<\/h3>\n\n\n\n<p>Allow 20.8 m x 10.8 m minimum for the enclosure itself, and roughly 23 m x 13 m per stand-alone court once access and structural clearance are included. Multi-court blocks with 1.5 m gaps need about 22.3 m width for two courts and 45.3 m for four.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What is the minimum height for an indoor padel court?<\/h3>\n\n\n\n<p>6.0 m of completely unobstructed height over the whole playing area, including light fittings \u2014 with 7 m+ recommended for warehouse conversions and 8 m above the net line required for elite competition. Beams, ducts and sprinklers must not intrude into this volume.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Do padel courts need planning permission?<\/h3>\n\n\n\n<p>In most jurisdictions, yes. The 4 m walls and 6 m lighting columns trigger consent, and enclosed or covered courts are usually regulated as buildings. Noise and light assessments are commonly required where housing is within 30\u201350 m of the court.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What glass is used in padel court construction?<\/h3>\n\n\n\n<p>Toughened (tempered) safety glass: 12 mm for all outdoor and canopy-covered courts, with 10 mm acceptable indoors. Panels must be individually certified, fixed with countersunk bolts, separated by a uniform 3\u20136 mm gap, and marked with manifestation dots at 850\u20131,000 mm height.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What is the cheapest way to build a padel court without compromising quality?<\/h3>\n\n\n\n<p>Source the court system factory-direct at a verified specification and tender the civil works locally against an engineer&#8217;s design. The court package is where a specification-matched china padel court factory saves the most; foundations and drainage are where cutting corners destroys the saving.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">How much does padel court construction cost per court?<\/h3>\n\n\n\n<p>As a 2026 benchmark: roughly \u00a371,000 all-in for one outdoor court with lights in the UK (court \u2248 \u00a336,000 + civils \u2248 \u00a335,000), dropping per court at scale. Factory-direct sourcing typically reduces the court-system portion by 30\u201350% at equal specification; civil costs are local.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Who should design the foundations?<\/h3>\n\n\n\n<p>A locally licensed structural engineer with professional indemnity insurance \u2014 using your site&#8217;s ground investigation and wind data. Manufacturers like PanoCourt supply base-plate layouts, structure weights and maximum design windspeed as engineering inputs, but never replace the local stamped design.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Conclusion: Build It Right the First Time<\/h2>\n\n\n\n<p>Successful padel court construction in 2026 is a sequence: verify the site (height, ground, grid), engineer the foundation locally, specify the court system by certificate rather than by photo, design the indoor climate as seriously as the structure, and secure permits before contracts. Get those five right and the court itself \u2014 glass, steel, turf, light \u2014 is the easy part.<\/p>\n\n\n\n<p>PanoCourt manufactures panoramic, full panoramic and classic padel courts factory-direct in China \u2014 hot-dip galvanised to EN ISO 1461, 80\u2013100 \u00b5m premium powder coating, 12 mm certified glass and full export documentation \u2014 and supports your local engineers with complete technical data for every padel court installation. Request our construction requirements pack and a project quotation at <a href=\"https:\/\/panocourt.com\/contact\/\">panocourt.com<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>Persyaratan pembangunan lapangan padel untuk tahun 2026: dimensi, pondasi, spesifikasi bangunan dalam ruangan, sistem HVAC, drainase, pencahayaan, izin, dan biaya \u2014 panduan perencanaan lengkap bagi para pembangun, pemilik klub, dan investor, berdasarkan standar LTA dan SAPCA.<\/p>","protected":false},"author":1,"featured_media":3228,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[44],"tags":[],"class_list":["post-3233","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-panoramic"],"_links":{"self":[{"href":"https:\/\/panocourt.com\/id\/wp-json\/wp\/v2\/posts\/3233","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/panocourt.com\/id\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/panocourt.com\/id\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/panocourt.com\/id\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/panocourt.com\/id\/wp-json\/wp\/v2\/comments?post=3233"}],"version-history":[{"count":1,"href":"https:\/\/panocourt.com\/id\/wp-json\/wp\/v2\/posts\/3233\/revisions"}],"predecessor-version":[{"id":3235,"href":"https:\/\/panocourt.com\/id\/wp-json\/wp\/v2\/posts\/3233\/revisions\/3235"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/panocourt.com\/id\/wp-json\/wp\/v2\/media\/3228"}],"wp:attachment":[{"href":"https:\/\/panocourt.com\/id\/wp-json\/wp\/v2\/media?parent=3233"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/panocourt.com\/id\/wp-json\/wp\/v2\/categories?post=3233"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/panocourt.com\/id\/wp-json\/wp\/v2\/tags?post=3233"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}